LOCATION:
Iriarte – Buenos Aires
CATEGORY:
Photovoltaic energy
CLIENT’S NEEDS:
Power supply for off-grid sewage treatment plant.
SOLUTION IMPLEMENTED:
A 3 kWp sun power plant was built and 8 batteries of 240 Ah 12 V were installed to feed the system and store energy. Three parallel inverters were installed to generate the three-phase power required. Completion period: 2 days